May 16, 2003 - Front Elevation
Shows the South elevation of the building. Note Block walls, framing and stud walls construction underway. Also notice Shikhar frame in place.
June 20, 2003
Floor
-
Fourth
Shows the fourth floor of the building. Notice duct work for air-conditioning and heating. Also notice masonry opening (windows).
NO PARKING
May 16, 2003 Floor
Fourth
Shows the fourth floor of the building. Note framing prior to sheetrock and door frame installation underway. Also notice electric conduits and drain pipes in place.
July 22, 2003 External Brickwork
Shows the West elevation of the building. Note brickwork underway.