Book Title: Vaastu Principles English
Author(s): Ankit Mishra
Publisher: Ankit Mishra

Previous | Next

Page 99
________________ FREE download Music and Vastu Book (PDF) 86 visit www.dwarkadheeshvatu.com 05:00 AM 06:00 AM 7 North East : If Stair case, loft, shelf, slab etc are in the shaded area, these may be separated from the walls by cutting off the concrete at least 3 inches. Constructions on the terrace be demolished and made flat. On every floor, covering up shaft, duct, open area at this side should be with similar material used for other construction. Such covering on the terrace should not exceed higher than foot. NE VE NW SE 10:00 SEAM Pm East: If Stair case, loft, shelf, slab etc are in the W. 07:30 shaded area, these may be separated from the walls by Dm cutting off the concrete at least 3 inches. Constructions on the terrace be demolished and made flat. On every floor, covering up shaft, duct, open area at this side should be with similar material used for other construction. Such covering on the terrace should 06:00 not exceed higher than foot. SWM Right Door W pm Noon 03:00 Noon 01:00 SouthEast: If Stair case, loft, shelf, slab etc are in the shaded area, these may be separated from the walls by cutting off the concrete at least 3 inches. Constructions on the terrace be demolished and made flat. On every floor, covering up shaft, duct, open area at this side should be with similar material used for other construction. Such covering on the terrace should not exceed higher than foot. Main door towards North-NorhtWest should be closed as also boring, septic tank, ditch etc in this area be filled up with sand and leveled. Central Area: If there be stair case, column or any construction in the shaded area (prime central area), these must be demolished. Shaft, duct, open area in the central area need not be covered. Note that on the terrace such covering (if any) should not exceed by higher than one foot. Boring, septic tank, ditch etc in this area be filled up with sand and leveled. South: If Stair case, loft, shelf, slab etc are in the shaded area, these may be separated from the walls by cutting off the concrete at least 3 inches. Constructions on the terrace be demolished and made flat. Boring, septic tank, ditch etc in this area be filled up with sand and leveled. Main door shall only be towards South East. Covering of shaft, duct, open area on this side should be done by using similar material used for terrace. Such covering on the terrace should not exceed higher than foot. South West : Boring, septic tank, ditch etc in this area be filled up with sand and leveled. No main door be there in this area. If stair case be in this area along with main door, the door need not be closed. Covering of shaft, duct, open area on this side should be done by using similar material used for terrace. Such covering on the terrace should not exceed higher than foot. West : Boring, septic tank, ditch etc in this area be filled up with sand and leveled. No main door be there in this area. If stair case be in this area along with main door, the door need not be closed. Covering of shaft, duct, open area on this side should be done by using similar material used for terrace. Such covering on the terrace should not exceed higher than foot. North West : If Stair case, loft, shelf, slab etc are in the shaded area, these may be separated from the walls by cutting off the concrete at least 3 inches. Constructions on the terrace be demolished and made flat. On every floor, covering up shaft, duct, open area at this side should be with similar material used for other construction. Such covering on the terrace should not exceed higher than foot. Main door towards North-NorhtWest should be closed as also boring, septic tank, ditch etc in this area be filled up with sand and leveled. North : If Stair case, loft, shelf, slab etc are in the shaded area, these may be separated from the walls by cutting off the concrete at least 3 inches. Constructions on the terrace be demolished and made flat. On every floor, covering up shaft, duct, open area at this side should be with similar material used for other construction. Such covering on the terrace should not exceed higher than foot.

Loading...

Page Navigation
1 ... 97 98 99 100