________________ 232 Appendices The budgeted cost is 250 million (Kenya) K shillings. Donation of 10 million k shillings was received from the Late Nathoo Meghji family when the foundation stone was laid. The project is to build: (1) A primary wing cost of 10 million K shilling, donated by the Suresh Bhagwanji Raja family. (2) A lecture theatre and a library at the cost of 2.5 million K shillings each. Total cost of 5 million K shillings donated by the Premchandbhai Foundation - Steel Africa family. (3) Playing fields and swimming pool at the cost of 5 million K shillings donated by the Late Ramji Karman Shah family. (4) One computer laboratory, one biology laboratory, one physics laboratory and a music center at the cost 500,000 K shillings each; and art & craft workshops at the cost of 250,000 K shillings each total of 1.5 million K shillings donated by the Premchand Kachra Shah Family. (5) A computer laboratory at the cost of 500,000 K shillings donated by the Amu Raja Family. (6) A chemistry laboratory at the cost of 500,000 K shillings donated by Late Mohanlal Kanji Hirji Shah family. (7) 34 Classrooms cost at the cost of 250,000 K shillings each. Donations for four classrooms have been pledged so far. A nursery wing, cost of 7.5 million K shillings, a secondary wing, cost of 10 million K shilling, a multi-purpose hall, cost 5 million K shillings, one domestic science workshop cost, 250,000 K shillings, One humanities workshop cost, 250,000 K shillings and one audio visual workshop cost, 250,000 K shillings. In addition to the outright donations scheme, there are platinum plaques schemes, which are outright donations of one million K shillings. So far, 3 platinum plaques have been pledged. There are several pledges of one million K