November 25, 2002 - Steel
Frame
Shows the construction of the steel beams and columns of the building.
December 30, 2002 -
Mechanical
Southeast corner of the basement shows plumbing installation underway.
December 30, 2002 -
Stairs
Facing South shows the installation of steel stairs at the East end of the basement. Also note block walls being built.
January 21, 2003 - Reserve Area Pipe
Shows the reserve area below the main gabhara. Notice the copper pipe extending from the central Shila stone to the second floor Gabhara.